top of page

Weather deck & rubbing bands


The weather deck framework is nearing completion but part of it will have to wait until I have built the drop keel trunk and had fabricated the keel itself which will be made of 10mm mild steel plate, galvanized. I will lower it into place inside the ballast keel slot and built the trunk around it as it's not practicable to raise the hull and fit it from beneath. Not enough headroom in the workshop. In the meantime I am repairing the rubbing bands as they are damaged throughout their lengths, some sections missing completely. I've probably spent over 60 hours so far repairing these bands.

Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Search By Tags
No tags yet.
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic
bottom of page